 TÜRKERLER GEOTHERMAL POWER PLANTWe completed all pre-construction period work items except for Environmental Impact Assessment for Türkerler Geothermal Power Plant (24+24 MW) located in Manisa Province, Alaşehir District. |  KAPIDAĞ WIND FARMWe completed all the pre-construction operations for Kapıdağ Wind Farm (28 MW) located in Balıkesir Province, Erdek District, except for the Environmental Impact Assessment. We are still conducting the pre-construction studies of the wind farm whose production capacity is planned to be increased to 34,85 MW with 3 additional wind turbines . |  BANDIRMA WIND FARMWe completed all the pre-construction operations for Bandırma Wind Farm (50 MW) located in Balıkesir Province, Bandırma District, except for the Environmental Impact Assessment. The capacity has been increased to 50 MW with additional 5 wind turbines. The wind farm is operating now. |
---|
 KUYUCAK WIND FARMWe completed all the pre-construction operations (all institutional permits, expropriation process, base map preparation and approval, landownership permits, zoning plan approval) for Kuyuacak Wind Farm (50,10 MW with 23 wind turbines) located in Manisa Province, Kırkağaç District. |  ÇATALTEPE WIND FARMWe completed all pre-construction period work items except for Environmental Impact Assessment for Çataltepe Wind Farm extension project of which total installed power increased from 16 MW to 27,50 MW with additional 5 wind turbines located in Balıkesir Province, Havran District. The wind farm has been under operation. |  KELTEPE WIND FARMWe completed all the pre-construction operations for Keltepe Wind Farm Extension Project (29,90 MW) located in Balıkesir Province, Susurluk District. The capacity has been increased to 29,90 MW with additional 3 wind turbines. The wind farm is operating now. |
---|